Prestige Flooring

Contact us to find out more.

5-first-coat-of-seal

Wollaton Hall

We were asked by Wollaton hall to renovate three separate areas that had been made in to one. Non of the areas were the the same flooring but the client wanted them to look uniform. We set to work Sanding the floors back to bare wood then staining in the new areas to match the existing. Once this was complete we applied five coats of heavy duty water based polyurethane seal.

qsgu4308

Thoresby Hall

The Thorsby Estate contacted us regarding the converted riding hall flooring as it had become worn and damaged. We advised a full resurface and a maintenance program put in place. After sanding the floor back to a clean finish we applied five coats of seal.

We returned the following year to light sand the surface and apply three more coats of water based polyurethane seal.

finished-job

Nottingham Train Station

Sub contracting for a large building company. We were given the task to repair, re sand and re seal the main ticket hall at Nottingham train station. First job was to repair a large area of failed sub flooring then supplying and laying new wood blocks to  match the existing. During the nights the floor sanding took place and in the day time we completed the sealing process. In all the total floor was completed in 4 nights and 4 days.

gary@gdaykinflooring.co.uk

0115 987 8239

228 Westdale Lane,
Carlton,
Nottingham NG4 4FU